Date of completion: Kadaka tee 90 building will be ready by autumn 2022.
Foundations: Kadaka tee 90 apartment building will be constructed on low-level foundation made from reinforced concrete.
Insulated external walls: The insulation material of external walls made of hollow core concrete blocks is foam polystyrene with a thickness of 250 mm, which is plastered and painted in different tones.
Soundproof internal walls: The walls separating apartments are 240 mm thick and made of hollow core concrete blocks filled with concrete. The non-load-bearing interior walls of apartments are light plasterboard walls on metal frame, which will be filled with insulation wool. Storage facilities are separated with light walls covered with veneer fastened to wooden frames, without finish.